An initial Highway Safety plan has been submitted to Hart District Council for changes to the existing pedestrian crossing arrangements of Hawley Road. The plan includes: Up-rating of the existing “children crossing” road signs with high visibility backboards Slow road markings at the position of the “children crossing” road signs Drop kerbs introduced to Hawley […]
Continue readingRevised Highways Documents Submitted
In response to the consultation received from Highways, the following documents have been submitted: HIGHWAYS CROSS SECTION PLAN TRAVEL PLAN REPORT The consultation response from Highways can be viewed at the Hart Planning Portal by clicking here
Continue readingAcceptance Of Initial Notice By Hart & Rushmoor Building Control Partnership
Notification of the acceptance of the Initial Notification Letter has been received from Hart & Rushmoor Building Control Partnership. This notification procedure is required as the project is using the independent Building Control services of BBS Building Control.
Continue readingDrainage Consultation Received
A favourable response has been received to the submitted documents: SITE INFILTRATION AND PERCOLATION TESTS SITE DRAINAGE MODELLING AND DESIGN The consultation response can be viewed at the Hart Planning Portal by clicking here
Continue readingSite Contamination Consultation Received
A favourable response has been received to the submitted Development Site Contamination Study document The consultation response can be viewed at the Hart Planning Portal by clicking here
Continue readingWatercourse Consents Received from Hampshire CC
Consents have been received from Hampshire County Council for: Watercourse Realignment Entrance Bridges These permissions allow realignment of the existing cross site piped watercourse around the footprint of the Day Nursery and bridges across the ditch to be formed to allow pedestrian and vehicle access. A separate application and permission is required from Hampshire CC […]
Continue readingStructural Calculations Completed
Modulus have completed the necessary Structural Engineering Reports. These reports detail the loads and stresses for the structural design and are intended for approval by Building Control and design requirements for the timber frame and foundation loads. The design of the Day Nursery differs from residential design by the long spans of the internal open […]
Continue readingLandscape Consultation Received
A favourable response has been received to the submitted Landscape documents: 622-LA- P- 01- LANDSCAPE GENERAL ARRANGEMENT PLAN 622-LA- P- 02- PLANTING PROPOSALS PLAN AND SCHEDULE The consultation response can be viewed at the Hart Planning Portal by clicking here
Continue readingPlanning Conditions Discharge Application Validated
An application for Discharge of Planning Conditions was validated by Hart District Council on 16 May 2017 as 15/02998/CON This application covers discharge of the following conditions: 2- External surfaces 3- Surface water drainage 4- Internal flood management 5- Tree survey and method statement 6- Vegetation trimming 7- Travel plan 8- Traffic management 9- CEMP 10- […]
Continue readingSoil Investigation Core Samples Completed
2 bore holes have been completed to extract core samples. These samples will be examined to determine the soil strata for the site foundation design and confirm the site water table level. Although the site soil strata is composed of both sand and gravel, a high clay content in the sub strata prevents good water […]