Watercourse Consents Received from Hampshire CC

Consents have been received from Hampshire County Council for: Watercourse Realignment Entrance Bridges These permissions allow realignment of the existing cross site piped watercourse around the footprint of the Day Nursery and bridges across the ditch to be formed to allow pedestrian and vehicle access. A separate application and permission is required from Hampshire CC […]

Continue reading

Structural Calculations Completed

Modulus have completed the necessary Structural Engineering Reports. These reports detail the loads and stresses for the structural design and are intended for approval by Building Control and design requirements for the timber frame and foundation loads. The design of the Day Nursery differs from residential design by the long spans of the internal open […]

Continue reading

Landscape Consultation Received

A favourable response has been received to the submitted Landscape documents: 622-LA- P- 01- LANDSCAPE GENERAL ARRANGEMENT PLAN 622-LA- P- 02- PLANTING PROPOSALS PLAN AND SCHEDULE The consultation response can be viewed at the Hart Planning Portal by clicking here

Continue reading

Planning Conditions Discharge Application Validated

An application for Discharge of Planning Conditions was validated by Hart District Council on 16 May 2017 asĀ 15/02998/CON This application covers discharge of the following conditions: 2- External surfaces 3- Surface water drainage 4- Internal flood management 5- Tree survey and method statement 6- Vegetation trimming 7- Travel plan 8- Traffic management 9- CEMP 10- […]

Continue reading