Beam & Block Suspended Floor Installed By LeRoc

The change to warmer weather allowed the concrete to cure to full strength, ready for LeRoc to install the suspended floor. The block and beam floor creates an underfloor ventilated cavity. This provides and area where the tree roots can exist without any long term disturbance to the building. The concrete building blocks were inserted […]

Continue reading

Ring Beam Concrete Cast Despite The Weather!

A minimum of 75 mm of concrete cover is required all around the steel foundation beams. This coating provides a surface for the beam and block floor and also prevents corrosion for the lifetime of the building by sealing against the oxygen and water necessary for rust to form. It is the only wet process […]

Continue reading