Consents have been received from Hampshire County Council for:
- Watercourse Realignment
- Entrance Bridges
These permissions allow realignment of the existing cross site piped watercourse around the footprint of the Day Nursery and bridges across the ditch to be formed to allow pedestrian and vehicle access. A separate application and permission is required from Hampshire CC to connect to the Hawley Green highway
