Timber Frame Erection Starting

Initial delivery of the ground floor panels has arrived and the 1st lift scaffold installed ready for the Merronbrook team to begin erection of the building frame. Once the ground floor panels have been installed on top of the DPC, a Glulam ring beam made of laminated wood and glue will be installed to distribute the load of the roof over the panels.